Fleet planning

We turn fleet operations into a charging plan.

We work from the way vehicles actually move through the day. Duty cycle, route distance, return pattern, dwell window and departure requirement tell us how much energy must be delivered, when it must be available and how much charging power the site needs to support.

Commercial vans parked together as an operating fleet

Operating inputs

We size infrastructure from the transport requirement.

A useful charging plan starts with the work the vehicles must complete. We translate that operating picture into energy demand, charging windows and a practical site requirement.

Duty cycle

We review how far vehicles travel, how hard they work and how much that pattern changes from one day to the next.

Return pattern

We map whether vehicles return together, in waves or continuously because arrival timing changes simultaneous charging demand.

Dwell window

We use the time each vehicle can remain connected to determine the charging rate actually required before its next assignment.

Departure requirement

We plan around which vehicles must leave first and how much energy they need at departure instead of treating every bay the same.

Power demand

We combine vehicle energy needs with charging overlap so the electrical design reflects realistic peak demand rather than a simple charger count.

Charger mix

We use the charging speed the operating window requires.

Not every vehicle needs the fastest available charger. Where vehicles remain parked for long periods, lower charging power can recover the required energy efficiently while reducing simultaneous site demand.

Where a short turnaround or priority departure needs faster recovery, we can reserve higher charging power for those vehicles and moments. Our charger mix follows the operating schedule.

From operating data to charging plan

We connect vehicle demand, parking time and site power in one model.

We do not plan the fleet and the electrical system separately. Our charging schedule, charger mix and power requirement are built from the same operating assumptions so the design can be tested against real departure needs.

01

Energy requirement

We estimate the energy vehicles need to recover after their routes and use that requirement to define the charging workload.

02

Charging overlap

We model how many vehicles are likely to charge at the same time and where scheduling can reduce unnecessary peaks.

03

Parking positions

We align charger placement with the bays vehicles can reliably occupy without disrupting yard movement or normal operations.

04

Growth path

We can prepare distribution and layout decisions for additional vehicles while keeping the first deployment tied to current demand.

What we need to begin

We can start with the fleet information you already have.

A complete engineering package is not required for the first conversation. We can begin with vehicles, routes, schedules and basic site context, then identify the technical information still needed.

Vehicles

Approximate fleet size, vehicle models or classes and any known charging capability.

Routes

Typical route distance, shift structure and the amount of variation between normal and demanding operating days.

Timing

Expected return times, next departure times and which vehicles have the least flexibility.

Site

Available parking, operating constraints and any existing information about the electrical supply.

Fleet planning

Bring us the operating day before you choose the chargers.

Share your vehicles, routes, return times and site context. We can turn that information into the first charging requirement.

Discuss fleet planning