Energy requirement
We estimate the energy vehicles need to recover after their routes and use that requirement to define the charging workload.
Fleet planning
We work from the way vehicles actually move through the day. Duty cycle, route distance, return pattern, dwell window and departure requirement tell us how much energy must be delivered, when it must be available and how much charging power the site needs to support.

Operating inputs
A useful charging plan starts with the work the vehicles must complete. We translate that operating picture into energy demand, charging windows and a practical site requirement.
We review how far vehicles travel, how hard they work and how much that pattern changes from one day to the next.
We map whether vehicles return together, in waves or continuously because arrival timing changes simultaneous charging demand.
We use the time each vehicle can remain connected to determine the charging rate actually required before its next assignment.
We plan around which vehicles must leave first and how much energy they need at departure instead of treating every bay the same.
We combine vehicle energy needs with charging overlap so the electrical design reflects realistic peak demand rather than a simple charger count.
Charger mix
Not every vehicle needs the fastest available charger. Where vehicles remain parked for long periods, lower charging power can recover the required energy efficiently while reducing simultaneous site demand.
Where a short turnaround or priority departure needs faster recovery, we can reserve higher charging power for those vehicles and moments. Our charger mix follows the operating schedule.
From operating data to charging plan
We do not plan the fleet and the electrical system separately. Our charging schedule, charger mix and power requirement are built from the same operating assumptions so the design can be tested against real departure needs.
We estimate the energy vehicles need to recover after their routes and use that requirement to define the charging workload.
We model how many vehicles are likely to charge at the same time and where scheduling can reduce unnecessary peaks.
We align charger placement with the bays vehicles can reliably occupy without disrupting yard movement or normal operations.
We can prepare distribution and layout decisions for additional vehicles while keeping the first deployment tied to current demand.
What we need to begin
A complete engineering package is not required for the first conversation. We can begin with vehicles, routes, schedules and basic site context, then identify the technical information still needed.
Approximate fleet size, vehicle models or classes and any known charging capability.
Typical route distance, shift structure and the amount of variation between normal and demanding operating days.
Expected return times, next departure times and which vehicles have the least flexibility.
Available parking, operating constraints and any existing information about the electrical supply.
Fleet planning
Share your vehicles, routes, return times and site context. We can turn that information into the first charging requirement.